Mr Patsy McGlone (Mid Ulster): To ask the Minister for Infrastructure to detail the wastewater flow rate for each wastewater treatment works facility (i) within the Lough Neagh catchment area; and (ii) across Northern Ireland as a whole. Minister for Infrastructure: The management of public wastewater infrastructure is an operational matter for NI Water. However, … Continue reading AQW 18501/22-27 – wastewater flow rate at wastewater treatment works within Lough Neagh catchment area
AQW 18501/22-27 – wastewater flow rate at wastewater treatment works within Lough Neagh catchment area
