Mr Patsy McGlone (Mid Ulster): To ask the Minister for Infrastructure, pursuant to AQW 48100/22-27, to detail, for each month since commencement of Contract C1247 Lot one (i) the monthly KPI 1 target; (ii) the number of sites which failed KPI 1; (iii) each site to which the contractual Service Credit of £50 per site, per week, until completion was applied; (iv) the number of weeks for which service credits accrued at each site; (v) any service credit calculation used; (vi) any service credits calculated for each individual site; (vii) any cumulative service credits (a) accrued; (b) recovered; and (c) outstanding for each month; and (viii) how these calculations reconcile with the total value of service credits accrued the figure of £1,800.
Minister for Infrastructure: The issue you have raised is an operational matter for NI Water; however, I have sought the required information.
NI Water has advised my department that:
Contractor completion reports were monitored throughout the contract period. Formal KPI measurement arrangements were implemented from April 2026.
| April 2026 | May 2026 | |
| Target Circuits | 811 | 743 |
Two.
The Service Credit mechanism commenced in April 2026. For the purposes of KPI measurement and application of Service Credits, the KPI 1 assessment was undertaken on a per-circuit basis. Applying this methodology produced an equivalent outcome of two failed sites under the current contractual calculation.
The Service Credit calculation for KPI 1 was based on four weeks (or part weeks) from April 2026.
For KPI 1, the assessment equated to two failed sites. Applying the contractual Service Credit of £50 per site per week resulted in a Service Credit of £400.
As above.
£400 for KPI 1
£0
£400 for KPI 1
KPI 1: Service Credits = £400
KPI 3: Service Credits = £400
KPI 5: Service Credits = £1000
Total Service Credits = £1800
ENDS